Rancho Barnardo Bathroom Remodel -

Scope of Work: the vanity was replaced, the tub was replaced, the drop ceiling over the vanity was removed, the tub area was tiled, and the floor tiled, the shower got a bench and was retiled, the toilet was replaced, recessed lighting over the vanity was installed,and two pendant lights, new sinks, and faucets.

Bathroom Remodeling Books

Before After